peptiderepo
|
d770e8a86a
|
feat: M4 in-admin manual generation on chained-cron checkpoints + IA/perf pass (v0.21.0) (#166)
Final Phase 2 admin milestone. Board "New Article" runs through the M3 chained-cron checkpoint state machine (one stage/idea per tick, queue persisted before generate, lock released on every exit path) so generation survives Hostinger background-kill; retires the SSH-only do_action workaround (WP-CLI routes through the same entry). IA/perf: settings-backed board/ideas pagination + db 1.4.0 indexes. Folds guard P2s (--self-test + window doc).
QA: APPROVE-WITH-P2-NOTES @ f2a00d4 + delta APPROVE @ 0c8071f. Deferred (tracked): class-admin-page.php 353-line split + pagination Settings-UI fields.
Agent-Session: phase2-admin-m4-20260614
|
2026-06-15 00:48:43 +07:00 |
|
peptiderepo
|
ac2f20de7e
|
feat: M3 edit + single-step re-run — input versioning, human-modified audit, staged re-run (v0.20.0) (#161)
QA: REJECT@6ed639d (CTO rebase header P1) -> APPROVE@6727e07 (qa-reviews/prautoblogger/2026-06-12-6727e07.md)
CPO guardrails 1-5 verified hard-AC. CEO conditional greenlight 2026-06-12 in chat (QA-APPROVE condition met).
Agent-Session: cto-m3-merge-20260612
|
2026-06-12 21:46:49 +07:00 |
|
peptiderepo
|
9c8e500244
|
v0.19.2 - Phase 2 admin M2: Article Dossier + class-prautoblogger split (#158)
Article dossier (Proposal C): per-stage input/output sections w/ raw-trace
toggle, metadata sidebar + per-stage cost receipt, run_decisions rationale,
image section, metabox dossier link, board deep-links. DB-migration methods
extracted to class-db-migrations.php (byte-parity verified by QA).
QA: APPROVE-W-P2 qa-reviews/prautoblogger/2026-06-12-579c66e.md
P2s carried to M3: populate request_json (input trace), sidebar pv
consolidation, image stages in run_stages. Thread: pipeline-v2-phase2-admin seq 16-20
Agent-Session: cto-phase2-admin-m2-merge-20260612
|
2026-06-12 18:01:39 +07:00 |
|
peptiderepo
|
49f17c3d6f
|
v0.19.0 - Phase 2 admin M1: kanban board + live progress; cost-reporter SQL fix (#156)
M1 of the Editorial Record admin (Direction C, CEO-ratified 2026-06-12).
Kanban dashboard (Generating/In Review/Published/Failed) as primary landing,
AJAX live progress via status poller, setting-backed poll interval + published
window, cost-reporter phpcs:ignore SQL fix, board column mapping tests.
QA: REJECT-P1 (29a334b) -> remediated -> APPROVE-WITH-P2-NOTES (60aa449).
Verdicts: qa-reviews/prautoblogger/2026-06-12-29a334b.md, 2026-06-12-60aa449.md
Thread: convo/prautoblogger/threads/2026-06-pipeline-v2-phase2-admin/ seq 1-9
Agent-Session: cto-phase2-admin-m1-merge-20260612
|
2026-06-12 14:55:48 +07:00 |
|